Recent Comments:

Recent Posts:

Worklog: Mighty Mite (02)

Posted by Richard on August 28th, 2008

I finished all of the cutting and drilling for the project.  I’ve moved on to installing hardware.  A few changes occured along the way.  I opted to not turn the HDD’s around because the sapce jsut wasn’t there.  I also installed a switch on teh bottom of the case for the cold cathodes.  Other than that, everything is going according to plan.  Here’s the pics: